Facility status is divided into processing line and measurement facility.

Processing LINE

No Facility Specification Quantity Note
1 MCT LCV30A 15 Machines Φ300 ~ 500mm, Robot Automation Facility
2 CNC LYNX220A 6 Machines Φ51 ~ 150mm, CNC Automation Line Configuration
3 Auto-cutter Auto two stroke 17 Machines 10mm ~ 380mm, Saw Type Cutter 14 Machines
4 Chamfer - 25 machines Inner Chamfer 9 Machines, Outer Chamfer 14 Machines, Inner/Outer Chamfer 2 Machines
5 Barfeed CNC BOSS 542/A 9 machines Cutting processing is possible at the same time, Φ51 or less
6 Inspector(Mechanical) - 8 machines Overall length/Outer diameter/Inner diameter/Keyway
7 Inspector(Vision) - 3 machines Overall length/Outer diameter/Inner diameter/Angle
8 Forging machine 100 TON 2 machines Knuckle Joint Press
9 Press 250 TON & 400 TON 2 machines Power Press
10 knurling machine - 1 machine -
Total 101 machines
No Facility Specification Quantity Note
1 Solution heat treatment machine 2 TON(Temperature: 400 to 550℃) 1 Facilities Solution heat treatment, Aging, Annealing
2 Heat treatment 2 TON(Temperature: 200 to 250℃) 1 Facilities Aging, Annealing
Total 2 Facilities

Measuring facility

No Facility Specification Quantity Introduced year
1 UTM 30 TON PRESS 1 2014
2 Shape meter 10 ~ 400mm 1 2016
3 33D Contactable meter 300x500x400 1 2016
4 Vision inspection system 250x300 1 2015
5 Rockwell hardness tester DTR-200 1 2014
6 Ecotive hardness tester - 1 2011
7 Stick Thermometer -20 ~ 925 ℃ 1 2011
8 Illumination meter 0 ~ 10.0000 LUX 1 2011